Monday 21 April 2014

the studio | studio fredrik lund












  the studio
                                     a wonderful place

  it must give


             a feeling of

                           an open landscape      a mood of dreaming

  wanting
  to create





































trygve ohren came by, and tried this architectural hat.
  










Thursday 10 April 2014

shelf house | construction period : august 2014 - august 2015




a difficult narrow site


                             high density

infill    

        built next to a semi-detached house



a potentially negative dark space is turned into the highlight of the house:
     
a long undulating wall with shelves       

a view  through glassdoors in the full length of the house                   



        ground floor

        first floor





collaborators:
paula lloveras
antonio lloveras